Consulting Services for Feasibility Study and Design for Water Supply Development to Support Economic Areas and Tourism of Ko Chang, Ko Chang Sub-district,Ko Chang District, Trat Province

Quick Facts

Client :

The Provincial Waterworks Authority

Services :

It is the Feasibility Study (FS), Detailed Design, Environmental Impact Assessment (EIA), and Public Participation to develop the water supply system to support economic areas and tourism of Ko Chang, Trat Province. The project aims to accommodate the water demand in the next 25-years. The project area covers four districts, namely, Mueang, Laem Ngop, Khao Saming, and Ko Chang. Phase 1 (10 Years) : Project components in this phase consist of raw water pump stations, two wastewater treatment plants, with a combined generation capacity of 700 m3/h, pumping stations, and pipeline with a diameter between 160-500 mm and a length of 95 km. The total cost of Phase 1 is 1,066 million bahts.

Phase 2 (20 Years) : Project components in this phase consist of raw water pump stations, three water treatment plants, with a combined generation capacity of 1,500 m3/h, pump stations, and pipeline with a diameter between 315-630 mm and a length of 36 km. The total cost of Phase 2 is 892 million bahts.

Scroll to Top