Study and Review of the Bhumibol Reservoir Inflow Augmentation

Quick Facts

Owner :

Royal Irrigation Department

Services :

Project Description :

It is the Feasibility Study (FS) and Environmental Impact Assessment (EIA) to divert water from the Salawin River and its tributaries. The feasible diversion route is the Yuan Dam-Bhumbibol Dam Diversion Route, which diverts water from the Yuam River to the Bhumibol Dam. The annual average diversion volume is at 1,795 m3/sec while the diversion rate is at 182.52 m3/sec. The total length of the diversion tunnel is approximately 62 km. There are beneficial agricultural lands during the dry season in the project area, totaling 1.3 million rai.

Scroll to Top